This was a wonderful community project spanning
from 22 April (2009) until Memorial day to build.
It was done mainly with students from two local
charter schools and with some retired guys that
were intrigued by the project. The building
material supplier was also on hand to help.
Reinhar has drawings available for those that
would like a start on their own project, or would
just like some insights. The bridge cost
$15,000 to build including abutment modifications.
The surrounding landscaping was another
$6,000.
It was paid for with a DNR grant and monies from
local community groups such as Rotary, Lions and
Kiwannis.
|